Page 17 - Koi Net - On-Line Koi Magazine - Issue 94
P. 17
Friday – always a busy day for the team managing the I mentioned earlier balloons going bang but the biggest
arrival of both dealers and exhibitors; a logistical bang of all came as we were benching late on Friday.
challenge given our limited access point. Whilst some We had been advised about a fire nearby that had
of the team managed the dealers, the benching team closed a road some of us use but little were we to know
set to work. We have a 4 man team who have worked that shortly after a HUGE explosion would occur which
together for many Shows and includes a senior judge, literally shook everything – including us! Some of you
a trainee judge, Rob Whittell and (err) me! may be familiar with the incident from the national news
A BUSY DAY of a fire at an industrial estate in Essex that lead to
Whilst we (well Rob) use the KSP software, we do not
FOR THE TEAM do pre-Show benching as it has caused us problems fertiliser being stored exploding, causing a great deal of
damage, putting 20 fireman in hospital and destroying
MANAGING in the past. We also think it sets an even playing field 3 fire engines, 2 other fire vehicles and multiple vehicles,
having the team measure all the Koi with the same
THE ARRIVAL bowl. With me on the net, Laurence on the bowl buildings, homes, etc., nearby. Next thing we knew, a
big cloud of smoke was overhead and debris falling
OF BOTH measuring and classifying, Keith double checking and WE WERE from the sky. This caused no issues inside the
Rob taking the pics on the iPad and updating KSP, we
DEALERS AND worked our way through 191 Koi across 25 vats. greenhouse but all our freshly filled water reservoirs
outside now had ash and debris in them and so, we had
Regrettably, 2 or 3 Koi had to be disqualified for health BACK EARLY
EXHIBITORS issues that the exhibitor had not spotted but this THE NEXT no choice than to dump the water and clean the pools –
shows the team were on the ball. we simply could not risk using it! This led to the next
MORNING AT challenge – with the fire brigade using all the hydrants
It was good to see a good mix across the Classes (as locally, including immediately outside the garden centre,
usual Bekko and Hikari Utsuri being low) and 9 Koi in 5.00am TO the water pressure was gone. The solution – a 5.00am
Size 7+ (we merge Size 7 and 8) including a 95cm UNCOVER start for the water team. Luckily, given how close we
Mukashi Ogon which we awarded Jumbo Champion were, we did not use power.
as the biggest Koi entered. THE VATS We had one late arrival after we had finished benching
A lesson learned from last year was we got to the end and decided to get that done rather than wait until the
of Friday we had 25 vats to cover with jump nets so following morning so that the vat sheets could be
this year we formed a small team whose job it was to printed and posted on the boards early the next day
cover the vats as they were benched and this certainly before we opened to the public. And so it was we left
A small team covered
the vats with jump nets. helped us get done at a sensible hour. the site in the safe hands of the overnight team.
We were back early the next morning (some as I
mentioned at 5.00am) to uncover the vats, check the
Koi and do the first water change. Overnight, one vat (in
fact the late arrival) had clearly been a little frisky and a
small number of eggs were on the bottom being eaten
by the Koi. The vat got a larger water change than
standard and was then tested and monitored.
The details of the Koi in each vat were posted so visitors
could tell what varieties and sizes they were seeing.
Importantly, a key member of the Crouch team was
preparing sausage rolls for the Show team and dealers
and the tea urn was fired up! Mmm, I wonder if it’s the
great food that has the dealers wanting to come back!
04 19

