Page 53 - Koi Net - On-Line Koi Magazine - Issue 64
P. 53

Right:
       The garden in 2002
       before we started to
       excavate.

       Below:
       We started digging in the
       spring of 2002, as we had
       no access for a digger we
       had no choice but to get
       digging by hand.




















                                                                                           Finally by July 2002 I had   After digging was complete, then it was time for the
                                                                                           dug the hole, bagged up   concrete base (mixed in my cement mixer all by hand).
                                                                                           all the clay and carried it
                                                                                           to the skips, with the help   The base was 9" thick and 12" thick around the edge
                                                                                           of Anthony who was only   creating a stronger footing, with steel reinforcing mesh
                                                                                           around 9 years old.   incorporated, this took me two days!

                                                                                                                 The blockwork took me the best part of a further 18
                                                                                                                 months, having a brief break in the winter of 2002 due
                                                                                                                 to the weather! As with everything Anthony and I seem
                                                                                                                 to do, the pond was overly complicated due to having
                                                                                                                 curved walls, meaning most of the blocks had to be cut
                                                                                                                 to different sizes to create smooth curves, even all the
                                                                                                                 sandstone coping stones were all cut, curved and
                                                                                                                 smoothed to match the walls.
                                          52                                                                                  53