Then it was the pipework and filters – the design had                               Another technical part of the build that gave a little
                             changed a couple of times to where we decided on the                                headache was the heating, as I wanted the pond
       WE DECIDED            state-of-the-art Nexus 300 with the Answer, new on the                              heating via our newly installed house Worcester Bosch
                             market by EA, I believe it was the first one to be fitted                           boiler, with the pond on its own zone valve completely
       TO USE A              to a pond here in the Northeast of England, we did not                              independent from the house central heating having its
       NEXUS 300             know anyone else that had one! The filter served us                                 own Heat Exchanger (HX) and digital stat all wired back
                             well, but as mentioned since the refit the filters are now                          up to the boiler control brain. Again, back in 2003 I did
       WITH THE              massively upgraded to drum, Bakki showers and                                       not know anyone who had done this the way I wanted it
                             moving bio beds. All the pipework was uPVC grey                                     installed! The pond is located away from the house, so I
       ANSWER –              pressure pipe which very few people had used and no                                 was a little apprehensive regarding the flow and return
       BOTH NEW              Koi dealers at that time supplied (only specialist pipe                             from the HX, but it worked brilliantly, as soon as the stat
                             companies stocked it), so it was interesting when I told                            called, the hot water was instant to the HX.
       ON THE                them the reason why we wanted this type of pipe.
                                                                                           In November 2003, 20 long   The big fill was November 2003, and the pumps were
       MARKET                                                                              months after the first   switched on for the first time! All in all, it had taken 20
                                                                                           excavation, we were ready
                                                                                           to fill our pond and switch   months from that first spade – it took a further couple
                                                                                           on the pumps.         of years to complete the cosmetics.









       We decided to fit a Nexus
       300 which was new to the
       market and used grey uPVC
       pressure pipe which we
       sourced from a specialist
       pipe company.